https://imgur.com/a/QR63ufQthe chinese text should be
[2019/7/15 Week TV contract ____ $ 134 715 ____ $3 787 938 ]
[2019/7/19 Team infrastructure level cost / recover ____ $ 1 250 000 ____ $ 2 537 938 ]
I build [TV&Radio Station] Level from 0 to 1, and [Merchandise Store] Level from 0 to 1.
build 0 to 1 need $500,000, so this need $ 1,000,000.
but cost $ 1,250,000.
I think this maybe because system save me other operate.
like [Health&Recovery Center] is level 1, if to 0 then to 1, so will recover $250,000 and cost 500,000.
Last edited by JerkyRay at 7/19/2019 5:09:44 AM